{"id":14721,"date":"2023-02-14T10:36:01","date_gmt":"2023-02-14T07:36:01","guid":{"rendered":"https:\/\/www.tespam.org\/tr\/?p=14721"},"modified":"2026-08-07T22:14:55","modified_gmt":"2026-08-07T19:14:55","slug":"akkuyu-nuclear-power-plant-cost-benefit-analysis","status":"publish","type":"post","link":"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/","title":{"rendered":"Akkuyu Nuclear Power Plant Cost &#038; Benefit Analysis"},"content":{"rendered":"<p><strong>Introduction to Akkuyu Nuclear Power Plant<\/strong><\/p>\n<p>Turkey is in need of finding a sustainable source for electricity production due to an<br \/>\nincreasing demand and consumption for electricity. The country has a huge current<br \/>\naccount deficit most of which results from its energy imports. Plans for nuclear power<br \/>\nconstruction are a key aspect of the country\u2019s aim for sustainable economic growth. In<br \/>\nTurkey, building up a nuclear power plant has always been a hot topic for discussion at<br \/>\nleast for 40 years. Turkey has had plans for establishing nuclear power generation since<br \/>\n1970. Today an application has been made for construction and operating licenses for<br \/>\nthe first plant at Akkuyu.<br \/>\nTurkey\u2019s electricity production was 240 billion kilowatt hours (kWh) or 240 Terawatt<br \/>\nhours, gross from 53 gigawatts electrical capacity (GWe) in 2012. Of this, 105 150 Terawatt hours (TWh) (44%) came from gas (two thirds of this from Russia, most of the<br \/>\nrest from Iran), 68 TWh (28%) from coal, and 58 TWh (24%) from hydro. In 2015,<br \/>\nthe percentage of electricity produced by gas decreased to 40%, which is still high. Net<br \/>\nimport was 3 TWh. Demand growth is about 8% pa, and in the first half of 2012 consumption was 119.3 billion kWh. Per capita consumption has risen from 800 kWh\/yr in<br \/>\n1990 to about 2700 kWh\/yr in 2011. Demand in 2023 is expected to be about 450 billion<br \/>\nkWh, implying new investments by then of $100 billion. (World Nuclear Association,<br \/>\n2014)<br \/>\nPlans for nuclear power are a key aspect of the country\u2019s aim for economic growth, and<br \/>\nit aims to cut back its vulnerable reliance on Russian and Iranian gas for electricity. The<br \/>\nMinistry of Energy and Natural Resources (ETKB) projects 2020 electricity production<br \/>\nas possibly 499 TWh in a high scenario of 8% growth, or 406 TWh with a low scenario<br \/>\nof 6.1% growth. Plans are to have 30 gigawatts of coal fired electrical capacity by 2023.<br \/>\nHowever, much of the country\u2019s coal resources are lignite with low calorific value \u2013 less<br \/>\nthan 12.5 MJ\/kg, and a substantial amount (Afsin Ebistan) at less than 5 MJ\/kg. (World<br \/>\nNuclear Association, 2014)<br \/>\nThe Akkuyu nuclear project has an estimated investment cost of about US$ 20 Billion.<br \/>\nAkkuyu plant will have four 1200 MWe AES-2006 units. The plant is estimated to be<br \/>\npaid off in 15 years. It is planned to be operational in 2018.<\/p>\n<div class=\"wp-block-pdfemb-pdf-embedder-viewer\"><a href=\"https:\/\/www.tespam.org\/wp-content\/uploads\/2023\/02\/AkkuyuNuclearPowerPlantCostBenefitAnalysis.pdf\" class=\"pdfemb-viewer\" style=\"\" data-width=\"max\" data-height=\"max\" data-toolbar=\"top\" data-toolbar-fixed=\"on\">AkkuyuNuclearPowerPlantCostBenefitAnalysis<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Introduction to Akkuyu Nuclear Power Plant Turkey is in need of finding a sustainable source for electricity production due to an increasing demand and consumption for\u2026<\/p>\n","protected":false},"author":187,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_thinkrank_schema_form_data":"","_thinkrank_selected_schema_type":"","_thinkrank_additional_schemas":"","_thinkrank_canonical_url":"","_thinkrank_og_title":"","_thinkrank_og_description":"","_thinkrank_og_image":"","_thinkrank_twitter_title":"","_thinkrank_twitter_description":"","_thinkrank_twitter_image":"","_thinkrank_imported_from":"","_thinkrank_focus_keywords":[],"_thinkrank_focus_keyword":"","_thinkrank_robots_meta_enabled":0,"_thinkrank_robots_meta":"","_thinkrank_advanced_robots_meta":"","_thinkrank_primary_category":0,"footnotes":"","_ppma_block_editor_authors":""},"categories":[1095,1145,109],"tags":[1617,1616,804,1620,1618,1621,1619,788,707],"ppma_author":[2156],"class_list":["post-14721","post","type-post","status-publish","format-standard","hentry","category-ekonomi-finans-marketler-deger-zincirleri","category-ept4","category-turkiye","tag-akkuyu","tag-akkuyu-nuclear-power-plant","tag-energy","tag-fision","tag-nuclear","tag-nuclear-benefits","tag-nuclear-cost","tag-nuclear-power-technology","tag-turkey"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Akkuyu Nuclear Power Plant Cost &amp; Benefit Analysis - T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Akkuyu Nuclear Power Plant Cost &amp; Benefit Analysis - T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi\" \/>\n<meta property=\"og:description\" content=\"Introduction to Akkuyu Nuclear Power Plant Turkey is in need of finding a sustainable source for electricity production due to an increasing demand and consumption for\u2026\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/\" \/>\n<meta property=\"og:site_name\" content=\"T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/tespam\" \/>\n<meta property=\"article:published_time\" content=\"2023-02-14T07:36:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-07T19:14:55+00:00\" \/>\n<meta name=\"author\" content=\"Sezayi Toprak\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@tespam_\" \/>\n<meta name=\"twitter:site\" content=\"@tespam_\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sezayi Toprak\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/akkuyu-nuclear-power-plant-cost-benefit-analysis\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/akkuyu-nuclear-power-plant-cost-benefit-analysis\\\/\"},\"author\":{\"name\":\"Sezayi Toprak\",\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/#\\\/schema\\\/person\\\/b16bdbea9c809080970f2b178ed39e1c\"},\"headline\":\"Akkuyu Nuclear Power Plant Cost &#038; Benefit Analysis\",\"datePublished\":\"2023-02-14T07:36:01+00:00\",\"dateModified\":\"2026-08-07T19:14:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/akkuyu-nuclear-power-plant-cost-benefit-analysis\\\/\"},\"wordCount\":378,\"publisher\":{\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/#organization\"},\"keywords\":[\"AKKUYU\",\"AKKUYU NUCLEAR POWER PLANT\",\"Energy\",\"fision\",\"NUCLEAR\",\"nuclear benefits\",\"NUCLEAR cost\",\"nuclear power technology\",\"Turkey\"],\"articleSection\":[\"Ekonomi-Finans-Piyasalar-De\u011fer Zincirleri\",\"EPT4\",\"T\u00fcrkiye\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/akkuyu-nuclear-power-plant-cost-benefit-analysis\\\/\",\"url\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/akkuyu-nuclear-power-plant-cost-benefit-analysis\\\/\",\"name\":\"Akkuyu Nuclear Power Plant Cost & Benefit Analysis - T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/#website\"},\"datePublished\":\"2023-02-14T07:36:01+00:00\",\"dateModified\":\"2026-08-07T19:14:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/akkuyu-nuclear-power-plant-cost-benefit-analysis\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/akkuyu-nuclear-power-plant-cost-benefit-analysis\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/akkuyu-nuclear-power-plant-cost-benefit-analysis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Akkuyu Nuclear Power Plant Cost &#038; Benefit Analysis\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/#website\",\"url\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/\",\"name\":\"T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/#organization\"},\"alternateName\":\"TESPAM\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/#organization\",\"name\":\"T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi\",\"url\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/tespam.org\\\/tr\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/TespamLogoNKVersion.png\",\"contentUrl\":\"https:\\\/\\\/tespam.org\\\/tr\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/TespamLogoNKVersion.png\",\"width\":2065,\"height\":1731,\"caption\":\"T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi\"},\"image\":{\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/tespam\",\"https:\\\/\\\/x.com\\\/tespam_\",\"https:\\\/\\\/www.instagram.com\\\/tespam_\\\/\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/TvEnerji\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/tespam\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/#\\\/schema\\\/person\\\/b16bdbea9c809080970f2b178ed39e1c\",\"name\":\"Sezayi Toprak\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g23494c9101089ad44ae88ce9d2f56aac\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"caption\":\"Sezayi Toprak\"},\"url\":\"https:\\\/\\\/www.tespam.org\\\/wordpress\\\/author\\\/sezayi-toprak\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Akkuyu Nuclear Power Plant Cost & Benefit Analysis - T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/","og_locale":"tr_TR","og_type":"article","og_title":"Akkuyu Nuclear Power Plant Cost & Benefit Analysis - T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi","og_description":"Introduction to Akkuyu Nuclear Power Plant Turkey is in need of finding a sustainable source for electricity production due to an increasing demand and consumption for\u2026","og_url":"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/","og_site_name":"T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi","article_publisher":"https:\/\/www.facebook.com\/tespam","article_published_time":"2023-02-14T07:36:01+00:00","article_modified_time":"2026-08-07T19:14:55+00:00","author":"Sezayi Toprak","twitter_card":"summary_large_image","twitter_creator":"@tespam_","twitter_site":"@tespam_","twitter_misc":{"Yazan:":"Sezayi Toprak","Tahmini okuma s\u00fcresi":"3 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/#article","isPartOf":{"@id":"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/"},"author":{"name":"Sezayi Toprak","@id":"https:\/\/www.tespam.org\/wordpress\/#\/schema\/person\/b16bdbea9c809080970f2b178ed39e1c"},"headline":"Akkuyu Nuclear Power Plant Cost &#038; Benefit Analysis","datePublished":"2023-02-14T07:36:01+00:00","dateModified":"2026-08-07T19:14:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/"},"wordCount":378,"publisher":{"@id":"https:\/\/www.tespam.org\/wordpress\/#organization"},"keywords":["AKKUYU","AKKUYU NUCLEAR POWER PLANT","Energy","fision","NUCLEAR","nuclear benefits","NUCLEAR cost","nuclear power technology","Turkey"],"articleSection":["Ekonomi-Finans-Piyasalar-De\u011fer Zincirleri","EPT4","T\u00fcrkiye"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/","url":"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/","name":"Akkuyu Nuclear Power Plant Cost & Benefit Analysis - T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi","isPartOf":{"@id":"https:\/\/www.tespam.org\/wordpress\/#website"},"datePublished":"2023-02-14T07:36:01+00:00","dateModified":"2026-08-07T19:14:55+00:00","breadcrumb":{"@id":"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.tespam.org\/wordpress\/akkuyu-nuclear-power-plant-cost-benefit-analysis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.tespam.org\/wordpress\/"},{"@type":"ListItem","position":2,"name":"Akkuyu Nuclear Power Plant Cost &#038; Benefit Analysis"}]},{"@type":"WebSite","@id":"https:\/\/www.tespam.org\/wordpress\/#website","url":"https:\/\/www.tespam.org\/wordpress\/","name":"T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi","description":"","publisher":{"@id":"https:\/\/www.tespam.org\/wordpress\/#organization"},"alternateName":"TESPAM","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.tespam.org\/wordpress\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/www.tespam.org\/wordpress\/#organization","name":"T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi","url":"https:\/\/www.tespam.org\/wordpress\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.tespam.org\/wordpress\/#\/schema\/logo\/image\/","url":"https:\/\/tespam.org\/tr\/wp-content\/uploads\/2022\/11\/TespamLogoNKVersion.png","contentUrl":"https:\/\/tespam.org\/tr\/wp-content\/uploads\/2022\/11\/TespamLogoNKVersion.png","width":2065,"height":1731,"caption":"T\u00fcrkiye Enerji Stratejileri ve Politikalar\u0131 Ara\u015ft\u0131rma Merkezi"},"image":{"@id":"https:\/\/www.tespam.org\/wordpress\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/tespam","https:\/\/x.com\/tespam_","https:\/\/www.instagram.com\/tespam_\/","https:\/\/www.youtube.com\/c\/TvEnerji","https:\/\/www.linkedin.com\/company\/tespam\/"]},{"@type":"Person","@id":"https:\/\/www.tespam.org\/wordpress\/#\/schema\/person\/b16bdbea9c809080970f2b178ed39e1c","name":"Sezayi Toprak","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g23494c9101089ad44ae88ce9d2f56aac","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"Sezayi Toprak"},"url":"https:\/\/www.tespam.org\/wordpress\/author\/sezayi-toprak\/"}]}},"authors":[{"term_id":2156,"user_id":187,"is_guest":0,"slug":"sezayi-toprak","display_name":"Sezayi Toprak","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","author_category":"","first_name":"","last_name":"","user_url":"","job_title":"","description":""}],"_links":{"self":[{"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/posts\/14721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/users\/187"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/comments?post=14721"}],"version-history":[{"count":1,"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/posts\/14721\/revisions"}],"predecessor-version":[{"id":18716,"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/posts\/14721\/revisions\/18716"}],"wp:attachment":[{"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/media?parent=14721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/categories?post=14721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/tags?post=14721"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.tespam.org\/wordpress\/wp-json\/wp\/v2\/ppma_author?post=14721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}